Abandoned website project: how to resume it and what can be recovered
A website or business app started and never finished can almost always be resumed from what exists. Here's what's saved, what's rewritten and in what order.
Published on · updated on November 26, 2026 · 9 min
A web project that has been sitting in a drawer can almost always be resumed from what already exists: the database, the screens, the business rules, meaning how you calculate prices and discounts and handle orders, and part of the code. In the projects I've picked up, on average between 50% and 70% of the previous work was kept; the rest is updated or rewritten. The path is always the same: a written inventory in two days, a first useful version smaller than the original plan, completion with AI reviewed by hand, and go-live in 2-8 weeks.
If you've paid for a website, an online store or business software that was left half-finished, the real question isn't "how do you manage a project". It's: how much of what I paid for can be saved? Here I try to give you a concrete answer.
Why web projects stall
The reason matters, because it changes what you find in the drawer. The four most common causes are:
- The budget ran out before the project did: the quote to finish it was out of reach and everything stopped.
- The project tried to do everything: lots of features in parallel, none of them really finished, nothing live.
- The developer is no longer around: they changed jobs or don't reply. If that's your case, start from the checklist for when your web developer disappears and secure access and code.
- Time has passed: the project was almost ready, but two or three years have gone by and in the meantime servers and libraries, the ready-made components the code relies on, have moved on.
None of these causes makes the work done useless. It only changes how much needs updating.
What can be recovered and what gets rewritten
A stalled project isn't a single block to keep or throw away. It's made of different pieces that age differently. This is the table I use as an outline for the inventory. Two terms you'll find here: the framework is the base structure the software is built on; APIs are the connections it uses to talk to external services such as payments and couriers.
| Component | Usually | When it needs rewriting | What I check |
|---|---|---|---|
| Database and data model | Recovered | If the tables no longer reflect the way you work | That the export opens without errors and the data makes sense |
| Business rules (prices, discounts, order statuses, permissions) | Recovered | Almost never: at most they get corrected | That they're written in the code, even if undocumented |
| Screens and design | Largely recovered | If the design doesn't suit mobile or today's brand | What was approved and what was still being tested |
| Application code | Partly recovered | If it runs on PHP or framework versions that are no longer supported | PHP version, framework, libraries |
| Integrations (payments, couriers, external APIs) | Almost always revised | If the providers' APIs have changed | The provider's current documentation |
| Content, copy and images | Recovered | Rarely | That they're yours and up to date |
| Quotes, emails, specifications | All recovered | Never | What was planned and what was paid for |
The result of the inventory is a written list in three columns: done, to finish, to redo. It's the document that lets you decide, and you can show it to anyone.
How much time matters: PHP versions
If the project is in PHP, like a large share of websites and custom business software, the version of the language says a lot about how much work there is to do. Every version has a date after which it no longer receives security fixes. These are the figures from the official php.net pages Unsupported Branches and Supported Versions, accessed in November 2026.
| PHP version | End of security support | What it means for a stalled project |
|---|---|---|
| 5.6 | 31 December 2018 | Most of the code needs rewriting; database and rules stay |
| 7.4 | 28 November 2022 | A major update, but most of the logic carries over |
| 8.0 | 26 November 2023 | Update of the version and the libraries |
| 8.1 | 31 December 2025 | A limited update |
| 8.2 | 31 December 2026 | To be updated soon |
| 8.4 | 31 December 2028 | Supported |
| 8.5 | 31 December 2029 | Supported |
In practice: a project stalled since 2021 is probably written for PHP 7.4, which hasn't received security fixes since the end of 2022. That doesn't mean throwing it away. It means moving to a supported version by following the official PHP migration guides, one version at a time, and updating the libraries. It's mechanical, well-documented work, and it's exactly the kind of work where AI, with careful review, saves the most time.
How I resume a stalled project: the steps in order
- Gather what you have: the code (a compressed .zip file is fine), an exported copy of the database, access to domain and hosting, quotes, screens and emails. If something is missing, we work out how to recover it in our first conversation.
- Inventory in two days: I read the code and the database, try what works and note what doesn't. You get the written list: done, to finish, to redo.
- First useful version: many projects stall because they tried to do everything. Together we decide which features are needed to go live; the rest goes on a list for version 2.
- Updating the foundations: PHP version, framework and libraries, before adding anything.
- Completion with AI and review by hand: I write the missing parts with an AI workflow that I review line by line. Every week you get a version to try.
- Go-live: domain, hosting and data migrated, with the code and access in your name.
From inventory to go-live usually takes between 2 and 8 weeks, depending on how big the first version is and how much needs rewriting.
The new case: apps started with an AI builder and left half-finished
There's a more recent kind of stalled project: the app built with an AI builder, a service that generates the application from a written description, such as Lovable, Bolt or Replit. You quickly get to a demo that looks almost ready, then you get stuck on login, permissions, payments or real data, and every request to the builder breaks something else.
Here too, the work done has value: the screens, the workflows and the data model already describe well what the app has to do. The first step is to get the code out of the platform. Lovable's documentation on the GitHub integration (accessed in 2026) explains that the code is initially stored and managed inside the platform, that you can export it and sync it to a GitHub repository, an online archive of the code, so you have a copy and can work on it elsewhere, and that on paid plans you can download it directly. For other builders, check the export options in their documentation.
Before writing a single line, in these projects I check three things: where the data really is and whose name the account is in, how access and permissions are handled, and which parts depend on the platform's services. From there we decide what to keep and what to rewrite with a structure that can handle real users and real data.
An example: starting from the first useful version
The step that really gets a project moving again is the third one: cutting. I apply it to my own products too. With CuraPiù, the nursing home management software I designed and built, the starting point wasn't a stalled project but paper: a printed medication chart, vital signs copied into Excel, the resident's care plan (known in Italy as the PAI) in Word. Instead of chasing every possible feature, I started from what's needed during a shift, such as logging an activity by scanning the resident's QR code in 3-5 seconds. I describe it in the CuraPiù case study.
With a stalled project the principle is the same, except that part of the work already exists. I've been doing this job since 2003, and I've learned to measure code without judging whoever wrote it: whoever came before had their own deadlines and constraints. What you need to know is what's there and what's missing, not who got it wrong.
Frequently asked questions
After how many years can a web project no longer be recovered?
There's no fixed limit. The database, the business rules and the screens remain valid even after many years; what ages is the code, tied to the PHP version and the libraries. A project on PHP 5.6 needs more rewriting than one on PHP 8, but the data and the logic can almost always be carried forward.
How much does it cost to resume an abandoned project?
Usually less than it would have cost when it stalled, because part of the work already exists and I complete the missing parts with an AI workflow reviewed by hand. The exact figure depends on the inventory: with the free analysis you get a written estimate with the timeline and what's left out of the first version.
Do I need the developer who started the project?
No. What's needed is the code, an exported copy of the database and access to domain and hosting. If the previous developer is available, an explanation from them saves time and is always welcome. If they don't reply, everything in your name is recovered and the code is read from there.
Can an app started with Lovable, Bolt or Replit be finished?
Yes, if you can export the code. On Lovable it syncs with GitHub, or it can be downloaded on paid plans. Then data, access and dependencies on the platform are checked, what holds up is kept and the rest is rewritten. Interfaces and workflows are an excellent starting point in any case.
Where to start again
If you have a project sitting in a drawer, the first step is to find out what it really contains. That's what I do when I pick up a stalled web project: a written inventory in two days, a first useful version decided together, completion with AI and go-live in weeks, with the work you've already paid for staying where it is. If the project stalled because the developer stopped replying, start from the checklist for when your web developer disappears. For everything else, book the free 30-minute analysis.